佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: roberto

投资快报 3

  [复制链接]
发表于 25-5-2011 08:51 PM | 显示全部楼层
回复 5919# 葉芬

你看除了芬姐之外,还有一位对我们默默无私的付出ROBETRO.是他叫我和SUNNY 老弟买QTWW!今天上太空了。
回复

使用道具 举报


ADVERTISEMENT

发表于 25-5-2011 08:54 PM | 显示全部楼层
回复 5900# roberto


    多谢ROBERTO 。今天叫大哥了,不叫小老弟了O(∩_∩)O哈哈~
回复

使用道具 举报

 楼主| 发表于 25-5-2011 09:37 PM | 显示全部楼层
本帖最后由 roberto 于 25-5-2011 09:46 PM 编辑

press release May 25, 2011, 8:10 a.m. EDT
Quantum Receives Fleet Contract from Dow Chemical
Plug-in hybrid Ford F-150 features new Quantum F-Drive powered by Dow Kokam lithium ion technology




IRVINE, Calif., May 25, 2011 /PRNewswire via COMTEX/ --Quantum Fuel Systems Technologies Worldwide, Inc.
QTWW +39.38% announced today that it has received a contract to deliver 100+ plug-in hybrid electric (PHEV) pickup truck fleet vehicles powered by Dow Kokam lithium ion battery technology to The Dow Chemical Company DOW -0.48%

Quantum developed the new hybrid drive system "Quantum F-Drive" specifically for the Ford F-150 pickup truck, one of the highest volume selling fleet vehicles in America. Quantum's research and development group designed the system to meet the demanding truck applications of America's largest fleet operators and to provide a mission-ready solution to meet President Barack Obama's goal of converting the Federal government's vehicle fleet to hybrids, electric vehicles and other alternative-fuel vehicles.

"Quantum is proud to be partnering with The Dow Chemical Company to launch the PHEV F-150 truck," said Alan Niedzwiecki, President and CEO of Quantum Technologies.  "We are excited and impressed by Dow's progressive thinking, environmental stewardship and willingness to lead."

"Dow is a recognized leader in sustainability, as demonstrated by our 2015 Sustainability Goals to reduce energy consumption and emissions, as well as in our mission to passionately innovate what is essential to human progress by providing sustainable solutions... like solar shingles and battery components for electric and hybrid-electric vehicles," said Dave Kepler, Dow's executive vice president, Business Services and Chief Sustainability Officer.  "By converting approximately 5 percent of our U.S. truck fleet to PHEV battery technology, we are driving the adoption of energy alternatives beyond existing boundaries while we work to reduce emissions and dependence on fossil fuel for fleet operations."
回复

使用道具 举报

发表于 25-5-2011 10:57 PM | 显示全部楼层
回复  roberto


    多谢ROBERTO 。今天叫大哥了,不叫小老弟了O(∩_∩)O哈哈~
migo 发表于 25-5-2011 08:54 PM



    你要请他们吃鲍鱼了~好好报答他们啦~
回复

使用道具 举报

发表于 25-5-2011 11:14 PM | 显示全部楼层
买了医药股,损失惨重。跌了> 50%. RPC, RADIENT PHARMA. 买价 0.5537, 现有价是 0.2300. 唉。。。。。
回复

使用道具 举报

发表于 25-5-2011 11:56 PM | 显示全部楼层
美国的药股很多投机的成份在里面.....
回复

使用道具 举报

Follow Us
发表于 26-5-2011 12:08 AM | 显示全部楼层
美国的药股很多投机的成份在里面.....
blue_angel_007 发表于 25-5-2011 11:56 PM



投机不成,反而身受其害。惨不忍睹。。。
回复

使用道具 举报

发表于 26-5-2011 12:19 PM | 显示全部楼层

希望QTWW明天安全降落。应为MONDAY是美国HOLIDAY.
回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 26-5-2011 01:55 PM | 显示全部楼层
回复 5928# migo

老大,这里越来越有趣! 之前有sampan,过后有游艇,再来有豪华邮轮和火箭,现在你再送个太空船过来
回复

使用道具 举报

 楼主| 发表于 26-5-2011 02:00 PM | 显示全部楼层
回复 5843# oswin

你的PZG慢慢上来了
回复

使用道具 举报

发表于 26-5-2011 03:25 PM | 显示全部楼层



美股大盘还要继续跌!


SPX周三收阳线,上下方都留下影线,表明多空双方争夺依然很激烈,从日线总体走势看,高位的通道整理走势仍然在持续,短期继续关注下行下行通道的趋势线支撑,在1308附近,强支撑在1300整数位置的趋势线支撑,压力下行小通道的上方趋势线压力,在1337位置,目前震荡下行的趋势仍然没有变,均线排列仍然呈附近,短期价格恐将继续下探。


回复

使用道具 举报

发表于 27-5-2011 01:00 AM | 显示全部楼层
回复  oswin

你的PZG慢慢上来了
roberto 发表于 26-5-2011 02:00 PM


还要靠大哥你帮忙推高~
回复

使用道具 举报

发表于 27-5-2011 09:22 PM | 显示全部楼层
本帖最后由 葉芬 于 27-5-2011 09:23 PM 编辑

Samson Oil & Gas Provides Operational Advice

Thu May 26 21:00:00 2011 EDT
DENVER & PERTH, Australia, May 26, 2011 (BUSINESS WIRE) --
Samson Oil & Gas Limited (ASX: SSN)(NYSE AMEX: SSN):

NORTH STOCKYARD PROJECT
Everett #1-15H (31% working interest)
Samson Oil & Gas Limited (ASX: SSN, NYSE AMEX: SSN) advises that the

      Everett #1-15H well is today drilling ahead in the lateral at a measured
      depth of 13,107 feet. Previous operations saw the 7 inch casing cemented
      at a measured depth of 11,231 feet. This depth was 112 feet shorter than
      planned but should not compromise the well because this section will be
      cased when the 4 inch liner is installed.
The lateral is being drilled whilst observing characteristic oil and gas

      shows. The Everett #1-15H well is located in Township 154N, Range 99W,
      Section 15 in Williams County, North Dakota. The Everett #1-15H well is
      Samson's sixth Bakken well in the North Stockyard Field.

Earl #1-13H (32% working interest)
Significant progress has been made in recovering the parted tubing
      string which was being used to drill the isolation plugs in the Earl
      #1-13H well. The remaining tubing and drilling assembly consists of a
      1,200 feet section and the top of this fish has been conditioned such
      that it should be able to be extracted in the next 24 hours.
The Earl #1-13H well is located in Township 154N, Range 99W, Section 13
      in Williams County, North Dakota.

HAWKSPRINGS PROJECT
Defender US 33 #2-29H (37.5% working interest post farmout)
The location of the Defender well, which will be the first of the
      Niobrara horizontals, has been agreed and is expected to spud in
      mid-July. This well is planned as a 4,000 foot lateral in the Niobrara
      'B' zone and will be fully funded by our farminee. The direction of the
      lateral will be determined only after an orientated core is recovered
      from the vertical pilot hole. Examination of the core and its fracture
      orientation will be used to finalize the preferred direction of the
      lateral.
The Defender US 33 #2-29H well is located in Township 25N, Range 63W,
      Section 29 in Goshen County, WY.
回复

使用道具 举报

发表于 27-5-2011 10:03 PM | 显示全部楼层
Samson Oil & Gas Provides Operational Advice

Thu May 26 21:00:00 2011 EDT
DENVER & PERTH, Austra ...
葉芬 发表于 27-5-2011 09:22 PM



   SSN将会回光反照.........
回复

使用道具 举报

发表于 28-5-2011 02:06 AM | 显示全部楼层
SSN将会回光反照.........
blue_angel_007 发表于 27-5-2011 10:03 PM



  有闲钱的话我也想拉回平均价~
回复

使用道具 举报

发表于 28-5-2011 09:14 PM | 显示全部楼层
SSN最近每一周都收低...............一周比一周低..........
回复

使用道具 举报


ADVERTISEMENT

发表于 28-5-2011 09:58 PM | 显示全部楼层
星期一, 美国有股市吗?
回复

使用道具 举报

 楼主| 发表于 29-5-2011 02:11 PM | 显示全部楼层
回复 5937# 追风人

希望QTWW明天安全降落。应为MONDAY是美国HOLIDAY.
migo 发表于 26-5-2011 12:19 PM
回复

使用道具 举报

发表于 29-5-2011 06:18 PM | 显示全部楼层
回复 5937# 追风人


    没有
回复

使用道具 举报

 楼主| 发表于 1-6-2011 08:31 AM | 显示全部楼层
本帖最后由 roberto 于 1-6-2011 08:35 AM 编辑

SSN没有债务了


SAMSONOIL & GAS PAYS OFF DEBT FACILITY, ADVISES ON OPERATIONS

Denver
1800 hours May 31St, Perth 0800 hours June 1st 2011

DEBT FACILITY

Samson Oil & Gas Limited (ASX: SSN, NYSE AMEX: SSN) advises that it has fully repaid its debt facility today. After this final repayment of the facility,which once stood at US$21 million,
Samson no longer has any debt on its balance sheet, and its current cash balance is approximately US$61.2 million. Samson holds its cash and cash equivalents in three US dollar denominated bank accounts ($54.8 million) and one Australian dollar denominated account (A$6.0 million).

EVERETT
#1-15H (31% WORKING INTEREST)
The Everett #1-15H well has reached a total measured depth of 17,350 feet, as planned, and is currently conditioning the hole prior to running the 4 1/2 inch production liner. This liner will enable a 20 stage fracture stimulation to be undertaken. Oil and gas shows consistent with the balance of the Bakken wells in this field were observed whilst drilling the final part of the lateral. The Everett #1-15H wellis located in Township 154N, Range 99W, Section 15 in Williams County, North Dakota. The Everett #1-15H well is Samson’s sixth Bakken well in the North Stockyard Field.


EARL#1-13H (32% WORKING INTEREST)

As expected, the remaining parted tubing was extracted from the stuck point andwas tripped out of the hole to the vertical part of the well bore. As the fish was moved, a marked increase in the flow rate was observed, and this flow rateof approximately 1,200 BOPD was too high to safely trip the balance of the tubing out of the well at that time. The work over crew then stood down for the holiday weekend.


Forecasted high winds in the area have curtailed operations today, but the forward strategy is to pump a well control fluid into the well and trip the fish out of the hole. Inspection of that recovery will determine the next step; if the entire bottom hole assembly is recovered, then the balance of the plugs will then be drilled out. TheEarl #1-13H well is located in Township 154N, Range 99W, Section 13 in Williams County, North Dakota.


For and on behalf of the board of

SAMSON OIL & GAS LIMITED

TERRY BARR

Managing Director
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 20-11-2024 06:40 PM , Processed in 0.186753 second(s), 18 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表