Re :BUILD IN CARPENTRY RENOVATION WORKS | BUILD IN CARPENTRY WORKS |
|
| Quotation |
|
Thank you for inviting us to quote you as the above stated project. |
|
|
|
|
|
As reference to our previous meeting, we are now pleased to submit our Quotation for your prompt consideration. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Carpentry buid in work |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) | Entrance |
|
|
|
|
|
|
|
|
|
a) | shoes rack cabinet 6 ft. |
|
|
|
|
| RM | 4,200.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) | Foyer |
|
|
|
|
|
|
|
|
|
|
a) | Feature decorative design wall c/w mirror , laminated wood & wall paper finish 14 ft. | RM | 9,800.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3) | Dining |
|
|
|
|
|
|
|
|
|
|
a) | new feature design decorative wall panel 8ft c/w mirror & laminated wood finish. . | RM | 6,400.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4) | dry kitchen |
|
|
|
|
|
|
|
|
|
a) | dry kitchen base units cabinet 10ft. |
|
|
|
| RM | 5,500.00 |
|
b) | dry kitchen wall units cabinet 10 ft. |
|
|
|
| RM | 5,500.00 |
|
c) | drawer sets with railing c/w Blum system railing. |
|
|
| RM | 1,500.00 |
|
d) | solid surface table top finish 10 ft for dry kitchen |
|
|
| RM | 2,800.00 |
|
e) | center Island counter top 6 ft |
|
|
|
|
| RM | 4,800.00 |
|
f) | center Island solid suface table top finish . 6 ft |
|
|
| RM | 1,680.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) | wet kitchen |
|
|
|
|
|
|
|
|
|
a) | L shape base unit door cover only 25ft. |
|
|
|
| RM | 8,750.00 |
|
b) | wall unit cabinet 6ft |
|
|
|
|
| RM | 3,300.00 |
|
c) | L shape concrete table c/w 2ft x 2ft polish tiles finish.25 ft |
|
| RM | 5,000.00 |
|
d) | Drawer sets with railing c/w Blum system railing. |
|
|
| RM | 1,500.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) | Living |
|
|
|
|
|
|
|
|
|
|
a) | TV base cabinet c/w drawer & glass door 12 ft. |
|
|
| RM | 5,400.00 |
|
b) | TV back drop feature design wall panel 12 ft c/w colour glass & laminated wood finish. | RM | 9,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) | Bedroom 4 c/w laminated , colour glass , mirror & wall paper finish. |
|
|
|
|
a) | Wardbrode 7ft c/w Alum sliding colour glass door. |
|
|
| RM | 5,600.00 |
|
b) | bed drop feature design wall panel. |
|
|
|
| RM | 4,200.00 |
|
c) | study table top c/w drawer sets 7 ft. |
|
|
|
| RM | 3,500.00 |
|
d) | whole room wall paper finish. |
|
|
|
|
| RM | 3,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) | first floor study areas |
|
|
|
|
|
|
|
|
a) | book rack cabinet cum display cabinet 6 ft |
|
|
| RM | 4,200.00 |
|
b) | study table top c/w drawer 12 ft. |
|
|
|
| RM | 6,000.00 |
|
c) | low filing cabinet 4 ft |
|
|
|
|
| RM | 2,400.00 |
|
d) | Wall cabinet cum open shelf display rack 10 ft |
|
|
| RM | 5,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9) | Master bedroom 1 |
|
|
|
|
|
|
|
|
|
a) | U shape walk in Wardbrode 24 ft c/w Alum frame colour glass open door. |
| RM | 19,200.00 |
|
b) | partition c/w door open for entrance walk in wardbrode. |
|
| RM | 2,800.00 |
|
c) | dreesing table c/w mirror & drawer 5ft. |
|
|
|
| RM | 2,600.00 |
|
d) | study table c/w dawer 10ft. |
|
|
|
|
| RM | 4,500.00 |
|
e) | extra wardbrode c/w Alum frame colour glass open door 5 ft. |
|
| RM | 4,000.00 |
|
f) | king size bed frame c/w bed head back drop design panel. |
|
| RM | 5,500.00 |
|
g) | bed side table 2 nos. |
|
|
|
|
| RM | 2,200.00 |
|
h) | Tv cabinet c/w back drop wall feature design wall on wardbrode backing. 10ft. | RM | 6,500.00 |
|
i) | wall paper for the whole room wall |
|
|
|
| RM | 3,500.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10) | secand floor main room |
|
|
|
|
|
|
|
|
a) | single bed frame c/w bottom cabinet storge. |
|
|
| RM | 2,000.00 |
|
b) | wardbrode 4 ft c/w laminated wood finish . |
|
|
| RM | 2,800.00 |
|
c) | small dressing cum warking table c/w dawer. 4 ft. |
|
|
| RM | 1,600.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) | MISC |
|
|
|
|
|
|
|
|
|
|
a) | Ground floor plaster ceiling c/w 2 design finish. |
|
|
| RM | 6,500.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b) | new wiring works lighting point for ground floor only |
|
|
|
|
|
| i) | light point 30 nos |
|
|
|
|
| RM | 2,400.00 |
|
| ii) | power point 10 nos |
|
|
|
|
| RM | 1,100.00 |
|
| iii) | TV point 1 no |
|
|
|
|
|
| RM | 300.00 |
|
| iv) | Fan point 2 nos |
|
|
|
|
| RM | 300.00 |
|
| v) | installation for whole house light fitting . |
|
|
| RM | 2,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12) | option for cover void areas |
|
|
|
|
|
|
|
|
a) | to remove & disposed the existing metal railing. |
|
|
| RM | 500.00 |
|
b) | To construct & supply new concrete slab to cover void areas. |
|
| RM | 8,800.00 |
|
c) | To install to match back existing floor finishing to make good finish. |
| RM | 3,000.00 |
|
| @ |
|
|
|
|
|
|
|
|
|
|
|
13) | a) To remove & disposed the existing metal railing. |
|
|
| RM | 500.00 |
|
| b) To supply & install new partition railing cum display shelf up to ceiling. |
| RM | 6,800.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| TOTAL | RM | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Noted: |
|
|
|
|
|
|
|
|
|
|
|
1 |
|
| Term of payment |
|
| 30% upon confirmation |
|
|
|
|
|
|
|
|
|
|
| 60% on progresssive claim |
|
|
|
|
|
|
|
|
|
| 10% upon completed |
|
|
|
|
2 |
|
| Commencing of work |
|
| 4 months |
|
|
|
|
|
3 |
|
| Validity |
|
|
| 1 month |
|
|
|
|
|
4 |
|
| Final invoicing will be based on final measurement at actual site |
|
|
|
|
5 |
|
| Any alteration and amendments of site from the above stated quotes will be considered as variation order |
|
6 |
|
| Drawings is an artist impression only and subject to confirmation of material and color |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assuring you of our best service & attention at all times. Should you have any question or concern, please do not |
|