佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: APULA

【SUNCON 5263 交流专区】双威建筑

  [复制链接]
发表于 5-2-2021 07:51 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON") -         LETTERS OF AWARD ISSUED BY SUNWAY VELOCITY TWO SDN BHD AND SUNWAY MEDICAL CENTRE SDN BHD
The Board of Directors of SunCon is pleased to announce that Sunway Construction Sdn Bhd (“SCSB”) has today, accepted two Letters of Award in respect of the following projects:-
(a) Letter of Award issued by Sunway Velocity Two Sdn Bhd (“SVTSB”), an indirect subsidiary of Sunway Berhad (“Sunway”) which in turn is a major shareholder of SunCon, in respect of the Main Building and Associated External Works for the Proposed Commercial Development of Sunway Velocity Two – Plot B Project which comprises the following:
(i) Phase 2A - 2 storeys of Business Premises, 8 storeys of Podium Carpark and 1 storey of Basement Carpark;
(ii) Phase 2B - 39 storeys of Serviced Apartment (Block C); and
(iii) Phase 2C - 39 storeys of Serviced Apartment (Block D)
on the land held under Lot No. 20056, Jalan Peel, Seksyen 90, Bandar Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur for a total contract sum of RM253,564,920.72 (“V2 Project”).

The V2 Project shall commence in November 2020 and is expected to be completed in September 2023; and

(b) Letter of Award issued by Sunway Medical Centre Sdn Bhd (“SMCSB”), an indirect subsidiary of Sunway, in respect of the Main Building Works for the Proposed Development of Sunway Medical Centre – Phase 4 Project which comprises the following:
(i) Phase 4A: 2 blocks of Medical Centres with 15 storeys and 10 storeys each; and 1 block of 9 storeys of Elevated Carpark on part of the land held under Lot No. 1356 (HSD 308674) and Lot No. 1368 (HSD 320686);
(ii) Phase 4B: 1 block of a 16-storey Hotel Suite on part of the land held under Lot No. 1356 (HSD 308674); and
(iii) Phase 4C: 1 block of a 9-storey Private Medical Centre
on the land held under Lot No. 1368 (HSD 320686), Jalan Lagoon Selatan, Bandar Sunway, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan for a total contract sum of RM612,305,000.00 (“SMC4 Project”). Out of the total contract sum, RM450.0 million had been accounted for in the existing order book of SunCon as SCSB has commenced works on the SMC4 Project upon the receipt of the Letter of Intent dated 1 June 2018 issued by SMCSB.

The SMC4 Project had commenced in August 2018 and is expected to be completed in August 2022.  

The V2 Project and SMC4 Project (collectively referred to as the “Projects”) are expected to contribute positively to the earnings of SunCon Group from the financial year ending 31 December 2020 onwards.

The Projects are subject to normal construction risk of materials price fluctuation. However, with the past experiences and expertise of SCSB in construction projects, this risk could be mitigated.
The Projects are considered as related party transactions by virtue of Evan Cheah Yean Shin being a Director and major shareholder of SunCon as well as director of several subsidiaries and major shareholder of Sunway. Tan Sri Dato’ Seri Dr Jeffrey Cheah Fook Ling, Puan Sri Datin Seri (Dr) Susan Cheah Seok Cheng, Sarena Cheah Yean Tih, Adrian Cheah Yean Sun, Sungei Way Corporation Sdn Bhd and Active Equity Sdn Bhd are major shareholders of both SunCon and Sunway as well as person connected to Evan Cheah Yean Shin. Tan Sri Dato’ (Dr) Chew Chee Kin is a Director of both SunCon and Sunway.

SunCon has obtained its shareholders’ mandate for such recurrent related party transactions entered into or to be entered into by SunCon and its subsidiaries with Sunway and its group of companies at its Annual General Meeting held on 5 August 2020.

The total new projects secured by SunCon Group this year including the abovementioned Projects amounted to RM1.983 billion.

This announcement is dated 30 September 2020.



回复

使用道具 举报


ADVERTISEMENT

发表于 20-3-2021 09:32 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON") -         LETTER OF AWARD ISSUED BY NATIONAL HIGHWAYS AUTHORITY OF INDIA
1. INTRODUCTION
The Board of Directors of SunCon is pleased to announce that Sunway Construction Sdn Bhd – RNS Infrastructure Limited (“Consortium”), a consortium formed by Sunway Construction Sdn Bhd (“SCSB”), a wholly-owned subsidiary of SunCon and RNS Infrastructure Limited (“RNS”)  has been awarded and has today, accepted the Letter of Award (“LOA”) issued by the National Highways Authority of India (“NHAI”), for the following project for a total contract sum of Rs.553.83 Crore (equivalent to approximately RM315.0 million) in addition to a 15-year operating and maintenance contract at Rs1.50 Crore (equivalent to approximately RM0.85 million) per annum:

“Two laning with Paved Shoulder of Meensurutti (Km. 98.433) to Chidambaram (Km. 129.965.) Section of NH-227 on Hybrid Annuity Mode under Bharatmala Pariyojana Phase-I (Residual Projects under NHDP) in the State of Tamil Nadu (hereinafter referred to as the “MC Project”).

2. ABOUT THE MC PROJECT
The MC Project will be operated under the Hybrid Annuity Mode (“HAM”) for a concession period of 15 years plus 2-year construction period. The construction for the MC Project is anticipated to commence within 195 days from the LOA. A Concession Agreement for the MC Project will be signed in due course.

Under the HAM, NHAI will pay 40% of the project cost in the first two years during the construction period in five equal instalments whereas the remaining 60% is paid over 15 years as fixed annuity amount plus interest which is benchmarked at RBI (Reserve Bank of India) rate + 3%. There is no toll right for the concessionaire. Revenue collection from the highway toll would be the responsibility of the NHAI.

The MC Project is expected to contribute positively to the earnings of SunCon Group from the financial year ending 31 December 2021 onwards.

3. INFORMATION ON THE CONSORTIUM
The Consortium has been formed between SCSB and RNS with the following participation interest, for the purpose of jointly bidding for the MC Project:
  • SCSB: 60%
  • RNS: 40%

4. INFORMATION ON RNS
RNS is a company incorporated in India with its registered address situated at Murudeshwar Bhawan, Gokul Road, Hubli 580 030, Karnataka, India. RNS has a paid-up share capital of INR630,000,000 comprising 630,000,000 ordinary shares.

RNS is an Indian local company owned by R.N. Shetty family. RNS provides wide range of infrastructure construction services such as construction of dams, highways, bridges, tunnels, power houses, and residential buildings.  

Apart from construction, RNS Group has exposure in education (nursing college, polytechnic and institute of technology), hotels, power plant and wind farms, manufacture of vitrified tiles and ceramic tiles, as well as dealership and showroom for Maruti cars.

RNS was SCSB's first joint venture partner when SCSB ventured to India in June 2001 for its first 2 infrastructure projects as well as SCSB’s first Hybrid Annuity Mode (HAM) project in Tamil Nadu, India which was announced by SunCon in March 2020.

5. REQUIREMENTS OF NHAI
It is a requirement of NHAI that a limited liability company shall be incorporated under the Indian Companies Act 2013 to undertake and perform the obligations and exercise the rights of the Consortium under the LOA, including the obligation to enter into the Concession Agreement for the execution of the MC Project.

In view thereof, SCSB and RNS will jointly incorporate a company in India (“JV Company”) with the same proportion of equity interest as mentioned above to jointly carry out the MC Project.

SCSB will fund its share of the equity participation in the JV Company through internally generated funds. The MC Project will be financed by the JV Company via its share capital as well as external borrowing.

6. PROJECT RISK AND OTHER ASSOCIATED RISKS
(a) Project Risk
The MC Project has price fluctuation clause throughout the 2-year construction period and 15 years’ maintenance period.
In addition, NHAI will pay the JV Company interest income on the 60% of the contract sum which will be paid over 15 years at RBI (Reserve Bank of India) rate + 3%. Under the HAM, it provides enough liquidity to the concession holder and the financial risk is shared by the NHAI. This will mitigate the fluctuating interest rate risk of the JV Company in financing the 60% portion of the project throughout 15 years.
(b) Financing Risk
Based on SCSB’s net cashflow and strong financial position, the JV Company is confident in securing the required financing for the MC Project.
(c) Foreign Currency Exchange Risk
Most of the costs of the MC Project will be in Indian local currency.  Coupled with the plan to have local INR financing, SCSB’s risk in relation to foreign exchange is limited apart from SCSB’s capital investment in the JV Company which SCSB will need to repatriate back once the concession period for the MC Project ends.

7. DIRECTORS' AND MAJOR SHAREHOLDERS' INTEREST
Insofar as the Directors are aware, none of the Directors or major shareholders of SunCon or persons connected with them has any interest, direct or indirect, in the MC Project.

8. PROJECTS SECURED IN 2020
The total new projects secured by SunCon Group this year including the MC Project amounted to RM2.319 billion.

This announcement is dated 28 October 2020.



回复

使用道具 举报

发表于 20-3-2021 09:33 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON") -         LETTERS OF AWARD ISSUED BY BORNEO SPRINGS SDN BHD, F&N DAIRIES MANUFACTURING SDN BHD AND F&N BEVERAGES MANUFACTURING SDN BHD
The Board of Directors of SunCon is pleased to announce that Sunway Engineering Sdn Bhd (“SunEng”), an indirect wholly-owned subsidiary of SunCon, has today accepted the following letters of award:

(a) Letter of Award issued by Borneo Springs Sdn Bhd in respect of the contract for Design, Supply, Deliver, Install, Commission and Apply and Secure SEDA Quota for Solar Photovoltaic System (“BS Project”) for a total contract sum of RM1,292,185.00.

The BS Project is located at Lot 7399, Jalan Mempaga, Mukim Sabai, 28600 Karak, Bentong, Pahang and it shall be completed within 12 months from the date of commencement to be agreed upon between the parties.

(b) Letter of Award issued by F&N Dairies Manufacturing Sdn Bhd in respect of the contract for Design, Supply, Deliver, Install, Commission and Apply and Secure SEDA Quota for Solar Photovoltaic System (“FNDM Project”) for a total contract sum of RM6,610,955.00.

The FNDM Project is located at Lot 56, Jalan Sungai Pinang 4/5, Selangor Halal Hub, Taman Perindustrian Pulau Indah Fasa 2, 42920 Pulau Indah, Selangor and it shall be completed within 12 months from the date of commencement to be agreed upon between the parties.

(c) Letter of Award issued by F&N Beverages Manufacturing Sdn Bhd in respect of the contract for Design, Supply, Deliver, Install, Commission and Apply and Secure SEDA Quota for Solar Photovoltaic System (“FNBM Project”) for a total contract sum of RM10,206,005.00.

The FNBM Project is located at No. 1 Jalan Bukit Blimbing 26/38, Persiaran Kuala Selangor, Section 26, 40400 Shah Alam, Selangor and it shall be completed within 12 months from the date of commencement to be agreed upon between the parties.

The BS Project, FNDM Project and FNBM Project (collectively referred to as the “Projects”) are expected to contribute positively to the earnings of SunCon Group from the financial year ending 31 December 2021 onwards.

The total new projects secured by SunCon Group this year, including the Projects, amounted to RM2.319 billion.

The Projects are subject to normal solar project risks. However, with the past experiences and expertise of SunEng in solar projects, these risks could be mitigated.
None of the directors or major shareholders of SunCon or persons connected with them has any interest, whether direct or indirect, in the Projects.

This announcement is dated 28 October 2020.

回复

使用道具 举报

发表于 20-5-2021 08:26 AM | 显示全部楼层
本帖最后由 icy97 于 5-6-2021 08:22 AM 编辑

Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR "COMPANY") -         INCORPORATION OF JOINT VENTURE COMPANY
Unless otherwise stated, all capitalised terms set out herein shall have the same meanings as those set out in SunCon’s announcement dated 28 October 2020 in relation to the MC Project awarded by NHAI to the Consortium formed by SCSB and RNS.

The Board of Directors of SunCon wishes to announce that a JV Company has been incorporated today under the Indian Companies Act 2013 with the name of Sunway RNSIL MC Private Limited (“Sunway RNSIL MC”). Sunway RNSIL MC will undertake the MC Project pursuant to the requirements of NHAI.

The registered office of Sunway RNSIL MC is located at Naveen Complex, 7th Floor, 14 M.G Goad Bangaluru, Bangalore KA 560001, India. The paid-up share capital of Sunway RNSIL MC is INR200,000 comprising 20,000 ordinary shares.

The equity participation of SCSB and RNS in Sunway RNSIL MC is at 60% and 40% respectively.

This announcement is dated 13 November 2020.




SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Sep 2020
30 Sep 2019
30 Sep 2020
30 Sep 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
419,409
402,582
925,416
1,282,792
2Profit/(loss) before tax
35,960
35,562
59,525
116,889
3Profit/(loss) for the period
24,230
33,024
43,267
97,629
4Profit/(loss) attributable to ordinary equity holders of the parent
24,043
33,482
42,586
97,685
5Basic earnings/(loss) per share (Subunit)
1.86
2.60
3.30
7.57
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
1.25
3.50


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.4700
0.4800

回复

使用道具 举报

发表于 29-12-2021 08:22 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2021
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Sep 2021
30 Sep 2020
30 Sep 2021
30 Sep 2020
$$'000
$$'000
$$'000
$$'000
1Revenue
272,078
419,409
1,102,545
925,416
2Profit/(loss) before tax
24,479
35,960
61,243
59,927
3Profit/(loss) for the period
19,519
24,230
45,760
43,669
4Profit/(loss) attributable to ordinary equity holders of the parent
19,296
24,043
47,861
42,586
5Basic earnings/(loss) per share (Subunit)
1.50
1.86
3.71
3.30
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
1.25
1.25


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.4900
0.4900

回复

使用道具 举报

发表于 9-3-2023 09:37 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY")- EXECUTION OF CONTRACT AGREEMENT BETWEEN SUNWAY CONSTRUCTION SDN BHD, POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2 AND SONG HAU 2 POWER COMPANY LTD FOR THE SONG HAU 2 THERMAL POWER PLANT PROJECT IN VIETNAM
The Board of Directors' ("Board") of SunCon refers the Company's announcement dated 28 December 2022 in relation to the execution of Interim Engineering, Procurement and Construction Agreement between Sunway-PECC2 Consortium, an unincorporated consortium comprising Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company and Power Engineering Consulting Joint Stock Company 2 (collectively referred as the “Contractor”), with Toyo Ink Group Berhad and Song Hau 2 Power Company Ltd (“Song Hau 2”) for carrying out and completing all works of design, engineering, procurement, manufacture, supply, construction, erection, testing and commissioning for Song Hau 2 Thermal Power Plant project located at Song Hau Power Generation Centre, Hau Giang Province, Vietnam (“Works”).

The Board of SunCon is pleased to announce that Song Hau 2 and the Contractor had on 1 March 2023, entered into a formal contract agreement to set out in detail their respective obligations, responsibilities, rights and liabilities in relation to the performance of the Works.

Please refer to the attachment for the full details of the announcement.

This announcement is dated 1 March 2023.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3333780

回复

使用道具 举报

Follow Us
发表于 9-3-2023 09:38 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY")- EXECUTION OF CONSORTIUM AGREEMENT BETWEEN SUNWAY CONSTRUCTION SDN BHD AND POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2 FOR SONG HAU 2 THERMAL POWER PLANT PROJECT IN VIETNAM
The Board of Directors' ("Board") of SunCon refers to the Company's announcement dated 28 December 2022 in relation to the execution of Interim Engineering, Procurement and Construction Agreement between Sunway-PECC2 Consortium (“Consortium”), an unincorporated consortium comprising Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company and Power Engineering Consulting Joint Stock Company 2 (collectively referred to as the “Parties”), with Toyo Ink Group Berhad and Song Hau 2 Power Company Ltd.

The Board of SunCon is pleased to announce that the Parties had on today, entered into a Consortium Agreement  to formalize their agreement and to set out the terms and conditions governing the performance of all works of design, engineering, procurement, manufacture, supply, construction, erection, testing and commissioning for Song Hau 2 Thermal Power Plant project located at Song Hau Power Generation Centre, Hau Giang Province, Vietnam (“Works”) as well as their respective rights, duties, liabilities and obligations under a Contract Agreement for the engineering, procurement, commissioning and construction of the Works.

Please refer to the attachment for the full details of the announcement.

This announcement is dated 1 March 2023.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3333779

回复

使用道具 举报

发表于 6-10-2023 02:42 PM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - LETTER OF ACCEPTANCE ON DAISO GLOBAL DISTRIBUTION CENTER WAREHOUSE ISSUED BY DAISO MALAYSIA GROUP SDN BHD TO KAJIMA - SUNCON JV, AN UNINCORPORATED JOINT VENTURE COMPRISING SUNWAY CONSTRUCTION SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF THE COMPANY AND KAJIMA (MALAYSIA) SDN BHD
The Board of Directors of SunCon is pleased to announce that KAJIMA – SUNCON JV, an unincorporated joint venture comprising Kajima (Malaysia) Sdn Bhd and Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company has on 5 October 2023 signed a Letter of Acceptance dated 5 October 2023 issued by Daiso Malaysia Group Sdn Bhd in respect of the proposed design and construction of Daiso Global Distribution Center Warehouse located at Pulau Indah, Port Klang, Selangor Darul Ehsan.

Please refer to the attachment for the full details of the announcement.

This announcement is dated 5 October 2023.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3390608

回复

使用道具 举报


ADVERTISEMENT

发表于 6-10-2023 02:42 PM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - LETTER OF INTENT ISSUED BY K2 STRATEGIC INFRASTRUCTURE MALAYSIA SDN BHD
The Board of Directors of SunCon is pleased to announce that Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company, has on 5 October 2023 accepted a Letter of Intent dated 4 October 2023 issued by K2 Strategic Infrastructure Malaysia Sdn Bhd in respect of the proposed development of Data Centre on a site located in Johor, Malaysia.   

Please refer to the attachment for the full details of the announcement.

This announcement is dated 5 October 2023.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3390609

回复

使用道具 举报

发表于 21-3-2024 11:29 PM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - PROJECT SERVICES REQUEST ENTERED BETWEEN SUNWAY CONSTRUCTION SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF THE COMPANY AND A MULTINATIONAL TECHNOLOGY CORPORATION
The Board of Directors of SunCon is pleased to announce that Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company, has on 21 March 2024 entered into a Project Services Request with a multinational technology corporation headquartered in the United States in respect of the construction and completion of a Data Center located in Selangor Darul Ehsan.

Please refer to the attachment for the full details of the announcement.

This announcement is dated 21 March 2024.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3432585

回复

使用道具 举报

发表于 21-8-2024 02:24 PM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON")- TARGETED DATE OF RELEASE OF UNAUDITED FINANCIAL RESULTS FOR THE SECOND QUARTER ENDED 30 JUNE 2024
We wish to announce that SunCon targets to release its unaudited financial results for the second quarter ended 30 June 2024 after 5.00 p.m. on Thursday, 22 August 2024.

This announcement is dated 8 August 2024.

回复

使用道具 举报

发表于 3-9-2024 02:21 AM | 显示全部楼层
本帖最后由 icy97 于 3-9-2024 02:23 AM 编辑

SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2024
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Jun 2024
30 Jun 2023
30 Jun 2024
30 Jun 2023
$$'000
$$'000
$$'000
$$'000
1Revenue
651,248
604,095
1,256,043
1,126,223
2Profit/(loss) before tax
50,206
42,263
91,854
79,778
3Profit/(loss) for the period
37,767
33,270
70,481
61,911
4Profit/(loss) attributable to ordinary equity holders of the parent
38,868
33,003
71,272
60,831
5Basic earnings/(loss) per share (Subunit)
3.01
2.56
5.53
4.72
6Proposed/Declared dividend per share (Subunit)
3.50
3.00
3.50
3.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.6700
0.6400





Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON") - MEDIA RELEASE OF THE FINANCIAL RESULTS FOR THE SECOND QUARTER ENDED 30 JUNE 2024
The media release provides an overview of the financial performance/ results of SunCon Group for the second quarter ended 30 June 2024.

Please refer to the attachment below for the full details of the media release.

This announcement is dated 22 August 2024.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3475955

回复

使用道具 举报

发表于 3-9-2024 02:23 AM | 显示全部楼层
SUNWAY CONSTRUCTION GROUP BERHAD

Entitlement subject
First Interim Dividend
Entitlement description
First interim single tier dividend of 3.5 sen per ordinary share for the financial year ending 31 December 2024
Ex-Date
11 Sep 2024
Entitlement date
12 Sep 2024
Entitlement time
5:00 PM
Financial Year End
31 Dec 2024
Period

Share transfer book & register of members will be
to  closed from (both dates inclusive) for the purpose of determining the entitlement
Payment Date
26 Sep 2024
a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers
12 Sep 2024
b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit

c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units)
(If applicable)

Entitlement indicator
Currency
Announced Currency
Malaysian Ringgit (MYR)
Disbursed Currency
Malaysian Ringgit (MYR)
Entitlement in Currency
Malaysian Ringgit (MYR) 0.0350

回复

使用道具 举报

发表于 9-2-2025 04:19 PM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON")- TARGETED DATE OF RELEASE OF UNAUDITED FINANCIAL RESULTS FOR THE FOURTH QUARTER ENDED 31 DECEMBER 2024
We wish to announce that SunCon targets to release its unaudited financial results for the fourth quarter ended 31 December 2024 after 5.00 p.m. on Thursday, 20 February 2025.

This announcement is dated 5 February 2025.

回复

使用道具 举报

发表于 21-2-2025 05:30 PM | 显示全部楼层
本帖最后由 icy97 于 21-2-2025 05:31 PM 编辑

SUMMARY OF KEY FINANCIAL INFORMATION
31 Dec 2024
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Dec 2024
31 Dec 2023
31 Dec 2024
31 Dec 2023
MYR'000
MYR'000
MYR'000
MYR'000
1Revenue
1,400,315
871,495
3,521,690
2,671,225
2Profit/(loss) before tax
110,582
60,756
272,962
188,646
3Profit/(loss) for the period
77,897
48,419
197,021
145,847
4Profit/(loss) attributable to ordinary equity holders of the parent
69,167
49,265
186,906
145,109
5Basic earnings/(loss) per share (Subunit)
5.36
3.82
14.50
11.25
6Proposed/Declared dividend per share (Subunit)
2.50
3.00
8.50
6.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent
0.6800
0.6400





Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON")- MEDIA RELEASE OF THE FINANCIAL RESULTS FOR THE FOURTH QUARTER ENDED 31 DECEMBER 2024
The media release provides an overview of the financial performance/ results of SunCon Group for the fourth quarter ended 31 December 2024.

Please refer to the attachment below for the full details of the media release.

This announcement is dated 20 February 2025.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3525339

回复

使用道具 举报

发表于 21-2-2025 05:37 PM | 显示全部楼层
SUNWAY CONSTRUCTION GROUP BERHAD

Entitlement subject
Third Interim Dividend
Entitlement description
Third interim single tier dividend of 2.5 sen per ordinary share for the financial year ended 31 December 2024
Ex-Date
13 Mar 2025
Entitlement date
14 Mar 2025
Entitlement time
5:00 PM
Financial Year End
31 Dec 2024
Period

Share transfer book & register of members will be
to  closed from (both dates inclusive) for the purpose of determining the entitlement
Payment Date
10 Apr 2025
a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers
14 Mar 2025
b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit

c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units)
(If applicable)

Entitlement indicator
Currency
Announced Currency
Malaysian Ringgit (MYR)
Disbursed Currency
Malaysian Ringgit (MYR)
Entitlement in Currency
Malaysian Ringgit (MYR) 0.0250

回复

使用道具 举报


ADVERTISEMENT

发表于 10-3-2025 06:47 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - ACCEPTANCE OF LETTER OF AWARD ISSUED BY SUNWAY INTEGRATED PROPERTIES SDN BHD TO SUNWAY CONSTRUCTION SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF THE COMPANY
The Board of Directors of SunCon wishes to announce that Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company, has on 5 March 2025 accepted a Letter of Award dated 28 February 2025 issued by Sunway Integrated Properties Sdn Bhd, an indirect wholly-owned subsidiary of Sunway Berhad for the construction works related to the Rapid Transit System Transport Oriented Development at Bukit Chagar.

Please refer to the attachment for the full details of the announcement.

This announcement is dated 5 March 2025.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3531544

回复

使用道具 举报

发表于 28-7-2025 02:18 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Mar 2025
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Mar 2025
31 Mar 2024
31 Mar 2025
31 Mar 2024
MYR'000
MYR'000
MYR'000
MYR'000
1Revenue
1,400,518
604,795
1,400,518
604,795
2Profit/(loss) before tax
113,217
41,648
113,217
41,648
3Profit/(loss) for the period
85,726
32,714
85,726
32,714
4Profit/(loss) attributable to ordinary equity holders of the parent
75,719
32,404
75,719
32,404
5Basic earnings/(loss) per share (Subunit)
5.87
2.51
5.87
2.51
6Proposed/Declared dividend per share (Subunit)
5.00
0.00
5.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent
0.7500
0.6800





Type
Announcement
Subject
OTHERS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON")- MEDIA RELEASE OF THE FINANCIAL RESULTS FOR THE FIRST QUARTER ENDED 31 MARCH 2025
The media release provides an overview of the financial performance/ results of SunCon Group for the first quarter ended 31 March 2025.

Please refer to the attachment below for the full details of the media release.

This announcement is dated 20 May 2025.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3554777

回复

使用道具 举报

发表于 28-7-2025 02:19 AM | 显示全部楼层
SUNWAY CONSTRUCTION GROUP BERHAD

Entitlement subject
First Interim Dividend
Entitlement description
First interim single tier dividend of 5 sen per ordinary share for the financial year ending 31 December 2025
Ex-Date
09 Jun 2025
Entitlement date
10 Jun 2025
Entitlement time
5:00 PM
Financial Year End
31 Dec 2025
Period

Share transfer book & register of members will be
to  closed from (both dates inclusive) for the purpose of determining the entitlement
Payment Date
25 Jun 2025
a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers
10 Jun 2025
b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit

c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units)
(If applicable)

Entitlement indicator
Currency
Announced Currency
Malaysian Ringgit (MYR)
Disbursed Currency
Malaysian Ringgit (MYR)
Entitlement in Currency
Malaysian Ringgit (MYR) 0.0500

回复

使用道具 举报

发表于 28-7-2025 02:22 AM | 显示全部楼层
Type
Announcement
Subject
TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS)
RELATED PARTY TRANSACTIONS
Description
SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - PROPOSED DISPOSAL OF CONSTRUCTION MACHINERY AND EQUIPMENT
The Board of Directors of SunCon wishes to announce that Sunway Construction Sdn Bhd, a wholly-owned subsidiary of the Company, has on 20 May 2025, entered into a Sales and Purchase Agreement for Equipment with Sunway Enterprise (1988) Sdn Bhd ("Sunway Enterprise") for the disposal of construction machinery and equipment to Sunway Enterprise, for a total consideration of RM8,676,000 (Ringgit Malaysia Eight Million Six Hundred and Seventy Six Thousand) only, inclusive of sale and service tax and any other applicable taxes.

Please refer to the attachment for the full details of the announcement.

This announcement is dated 20 May 2025.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3554785

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 29-7-2025 06:02 AM , Processed in 0.185473 second(s), 22 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表