|
有谁做过这个POE,这是一个servey,我想了解更多详情。
这个servey是architect firm做的吗?有什么功能?
http://www.plymouth.ac.uk/pages/view.asp?page=8935
Post Occupancy Evaluation (POE)
and its Integration with Sustainable Building
Without POE, the sustainability of buildings in occupation may only be assumed rather than measured. With increased emphasis on sustainable design technologies, for example passive solar gains and natural ventilation, comfort and functionality of buildings may be compromised, which in turn may hinder steps towards sustainability.

The University was the first course in the UK to fully integrate local and global environmental matters into its undergraduate Building Surveying courses, accredited by the RICS. Over the last 14 years, it has attracted committed staff from industry and academia and built up numerous partnerships with industry and organisations, at home and abroad, covering all aspects of sustainable construction, including design, law, contract, technology, safety and energy.
In 2003/4 POE was undertaken at the Eden Project and at the Royal Cornwall Hospital. At the Eden Project, the POE was of the phase 3 Foundation Building and will be used to inform the phase 4 Education Building. At the Royal Cornwall Hospital, communication routes informing design were assessed.
POE and its Integration with Sustainable Building offers many research themes including the use of technologies, energy in use, the social and economic aspects of sustainability, the procurement and design processes.
[ 本帖最后由 Atila02 于 16-2-2006 03:35 PM 编辑 ] |
|